Economic Evaluation of Industrial Plantation Forest Residues for Energy Fulfillment in the IKN

Authors

  • Erwan Hermawan a:1:{s:5:"en_US";s:16:"Researcher, BRIN";}
  • Adiarso Adiarso Research Center for Process and Manufacturing Industry Technology – National Research and Innovation Agency
  • R. Agung Wijono Research Center for Process and Manufacturing Industry Technology – National Research and Innovation Agency
  • Usman Sudjadi Research Center for Nuclear Fuel and Radioactive Waste Recycling Technology, National Research and Innovation Agency
  • Hari Setiawan Research Center for Process and Manufacturing Industry Technology – National Research and Innovation Agency

DOI:

https://doi.org/10.19028/jtep.012.1.35-56

Keywords:

biomass power plant, Industrial forest plantation, techno-economic

Abstract

Indonesia's population growth rate has been 1.25% per year in the last ten years. The increase in Indonesia's population impacted national energy consumption, increasing from 3.01 barrels oil equivalent (BOE) per capita in 2013 to 3.12 BOE per capita in 2020. The efforts to reduce these emissions is utilizing renewable energy sources, especially from the forestry sector. One of the products is biomass, or products in the form of wood pellets. Biomass from rubber plantation activities, logging residue, and sawn timber residue have an energy potential of 152 GJ per year. The government effort to overcome environmental problems is to move the Indonesia Capital City to East Kalimantan Province. There are great potential to utilize the forestry sector in supplying energy, one of which is residue from industrial plantation forests (HTI). This study calculates the economics of wood pellet products from HTI residue as raw material for Biomass Power Plants. Based on the calculation, the minimum price for wood pellets is Rp. 1,700/kg and obtained an IRR of 13.1%, NPV Rp. 41 billion, and a payback period of 8.1 years. Using the input of the economic price of wood pellets as the purchase price of raw materials for power plant, the economic price of electricity is Rp. 3,000/kWh. The price is higher than regulated price, another solution is converted electricity into steam. The minimum steam price is Rp. 740/kg, so the economics of power plant achieved IRR 11.4%, NPV Rp. 21.7 billion, and payback period of 8.3 years.

Downloads

Download data is not yet available.

Downloads

Published

2024-04-04

How to Cite