[1]
Devianti, D. et al. 2020. Study of hydroelectric power capacity using the rational method in the Lawe Sempali subwatershed, Aceh Province. Jurnal Pengelolaan Sumberdaya Alam dan Lingkungan (Journal of Natural Resources and Environmental Management). 10, 2 (Jul. 2020), 307–319. DOI:https://doi.org/10.29244/jpsl.10.2.307-319.